Learning About BIM Management
In the video below we share the steps to create a BIM Execution Plan (BEP), follow the ISO 19650 standards for agreeing on a BIM Scope, share how teams can manage their BIM tasks and some tips on how to verify against the owner’s BIM requirements.
We cover the following key areas of BIM Management:
- Creating the BIM Execution Plan
- Agreeing on the BIM Scope
- Managing BIM tasks as a team
- Verifying the owner’s BIM requirements
Thanks to the Blaze team for co-hosting this informative BIM Management Education session!
Unlocking the Combined Power: LOD + LOIN + LOA (+IDS!)
Level of Detail (LOD), Level of Information Need (LOIN), and Level of Accuracy (LOA) are key aspects in BIM, though they can be challenging. This blog and video will guide you in mastering LOD, LOIN, and LOA, and show how Plannerly combines them effectively.
Creating a Responsibility Matrix for Effective BIM Project Management
The most simple approach to create a responsibility matrix and export filtered IDS (Information Delivery Specification) files!
buildingSMART and Plannerly Partner to Drive Standardization in the AEC Industry
Learn how Plannerly, a proud partner of buildingSMART, collaborates to support integrated workflows and create intuitive software for AEC teams worldwide.