Skip to main content
Start free Start free Open Plannerly (opens in a new tab)

Case studies

Government case study

How JTC cut model checking time by 95% with Plannerly

JTC Corporation, under Singapore's Ministry of Trade and Industry, moved its 11,000-row Excel requirements into Plannerly and automated its model checks. Checks that took weeks now take hours.

The results, in JTC's own figures

  • 95%Faster model validationJTC Corporation, Singapore
  • 11,000Excel rows eliminatedMoved into structured templates in Plannerly
  • 2,000+Object types defined across 27 model categoriesJTC's Model Content Requirements (MCR)

About JTC

JTC Corporation, under Singapore's Ministry of Trade and Industry, is the national agency driving industrial infrastructure development. JTC manages the full project lifecycle - from planning and design to construction, facility management and estate rejuvenation - so accurate, structured data is essential for moving smoothly between project phases.

The challenge

With projects spanning many stakeholders and phases, JTC faced:

  • An 11,000-row Excel document holding its Model Content Requirements (MCR)
  • Manual, inconsistent compliance checks
  • Different data expectations across consultants, contractors and FM teams
  • No easy way to track model progress or data quality over time
Compliance checks used to be a black box. Now, with Plannerly's Verify module, every requirement is traceable and auditable.
LokJTC Implementation Partner

What JTC did

In 2023, JTC started using Plannerly to host, standardise and automate its Model Content Requirements.

Moved the requirements out of Excel

The team moved more than 11,000 rows of data from Excel into structured templates, and defined 2,000+ object types across 27 model categories and 300+ subcategories.

Gave every role its responsibilities

Modelling responsibilities were assigned with role-based filtering.

Automated the model checks

Weekly (or more frequent) model checks run automatically in the Verify module, with the results on visual dashboards using red, yellow and green compliance indicators.

Launched MCR 2.0

By 2024, JTC launched MCR 2.0, fully integrated with Plannerly workflows and aligned with IFC SG standards.

The impact

  • 95% less model-checking effort
  • Compliance workflows that are auditable and traceable
  • Faster coordination through partial model check-ins
  • People in non-BIM roles can take part
  • The MCR is now expanding to infrastructure projects

In their own words

Before Plannerly, it took weeks to do model checks - now we do it in hours.
John KiongDirector, Future of Building & Infrastructure Division, JTC Corporation

Case studies

More customer stories

  • Australia

    Government QA

    Model data checked against information requirements

    Government model checking for transport infrastructure

    Queensland Department of Transport and Main Roads · Government owner

    Queensland's Department of Transport and Main Roads uses Plannerly Verify to check supply-chain model data against defined information requirements, giving the team more certainty that model deliverables contain the information they expect.

    It highlights the need for due diligence when pulling all of the pieces of the puzzle together.
    Bryan McSweeney, Manager - Special Projects · TMR
    • Government
    • Verify
    • Model Checking
  • Hong Kong

    80% time saving

    BIM & ESG verification

    No more 90-day BIM setup delays

    MTECH Engineering · Digital construction

    Delivered 16+ major projects at Hong Kong International Airport. Setup time dropped from 90 days to 20 days, with ESG goals embedded from day one.

    With Plannerly, we don't just create a plan, we live it. It's how we put the BIM Execution Plan into daily practice.
    Stephen Au, Director · MTECH
    • ESG
    • Airport
    • 16+ projects
  • Luxembourg

    Revit + Plannerly

    Seamless government compliance

    Revit just got smarter

    BIM Consult · Plugin development

    A custom Revit plugin built on Plannerly requirements lets modelers view, fill, and verify parameters without leaving Revit, with multi-language support for Belgium and Luxembourg.

    If you follow the government track, just click the button. It's already done for you.
    • Revit
    • Plugin
    • Government

See all case studiesOwners, design teams, contractors, consultants and educators - filter them by your kind of organisation.

Make every requirement traceable on your projects

Book a live demo and see how requirements and automated model checks work together in Plannerly.

Sign in to keep your progress

Use your Plannerly account - the same email and password as the app. Every lesson stays open either way.

Learned with a different email? Sign in to that account here and we'll bring its courses, progress and certificates into the one you're signed in with. Certificate links and QR codes keep working.

Forgot that password? Reset it first, then come back. Want to keep the other account instead? Sign out and sign in with that one.