Free live webinar series
How to survive as a BIM Manager
You're the one chasing every team for files, dates and signatures. Every other Thursday, in 45 minutes, we take one of those jobs - the MIDP, the RACI, information requirements, the CDEs - and fix it live in Plannerly. Free on Zoom, with the replay and a free survival kit after.
Every other Thursday, 45 minutes on one job that decides whether you get the information you asked for: requirements, delivery plans, accountability and CDEs, fixed live in Plannerly. Free on Zoom, with the replay and a free kit after.
Every other Thursday, 45 minutes on one job that keeps subcontractors delivering: the MIDP, the RACI, requirements and CDEs, fixed live in Plannerly. Free on Zoom, with the replay and a free kit after.
Every other Thursday, 45 minutes on one job that keeps the design team's deliverables agreed and on time, built live in Plannerly. Free on Zoom, with the replay and a free kit after.
Every other Thursday, 45 minutes on one job you run for clients - delivery plans, RACI, requirements, CDEs - built live so you can reuse the method. Free on Zoom, with the replay and a free kit after.
Every other Thursday, 45 minutes of ISO 19650 done live on a real project - ready-made material for your students. Free on Zoom, with the replay and a free kit after.
Free on Zoom. Can't make it? The replay and the kit follow here.
How it works
What you get when you join a free episode
-
Save your seat
Register free for an upcoming episode below. Zoom emails you the link to join.
A free seat, nothing to install -
Join live for 45 minutes
One BIM manager job, fixed live in Plannerly on a real project. Bring your questions.
The whole method, start to finish -
Take the survival kit
After the show the replay goes up here with chapters, and a free survival kit for the job: a starter project and PDFs.
The method, ready to reuse -
Use it on your project
Start free and do the same job on your own project, with a lesson and a setup guide for each step.
The job done on Monday
Free live webinar · Episode 3
Surviving ISO 19650 Information Requirements with AI
Build it. Connect it. Just ask Javis. Most owners aren't sure what to ask for, and requirements copied from the last job create work nobody needs. Three ways into your project's information requirements - build on the Plannerly API, connect your own AI with Plannerly MCP, or just ask Javis - on one structure your supply chain can check against.
Free webinar on Zoom · 45 minutes · How to survive as a BIM Manager
Thursday 22 October 2026
You'll leave with
- Requirements your supply chain can check against
- The ten building blocks every requirement hangs on
- Questions to ask Javis, Claude and ChatGPT about your project
- The example project and the MCP setup guide
Free live webinar · Episode 4
Surviving the seven CDEs
Connect them. Keep them in step. Stop re-uploading. Most projects run more than one common data environment, so the single source of truth quietly becomes several and you spend your week re-uploading. How to keep every CDE in step with the agreed plan, so delivered files check themselves off and the dashboards move on their own.
Free webinar on Zoom · 45 minutes · How to survive as a BIM Manager
Thursday 5 November 2026
You'll leave with
- Every CDE on the project connected to one plan
- Delivered files matched to the request they fill
- Dashboards that move as files arrive
How to survive as a BIM Manager · Episode 2
Surviving the RACI
Accountable. Agreed. Evidenced. Who owns it, who agreed to it, and the evidence they delivered. The responsibility matrix taken out of the BEP appendix and put on the work itself - assigned, agreed in per-team contracts and tracked - live in Plannerly.
Chapters
- Surviving the RACI00:00
- Why responsibility matrices stop working02:56
- From the MIDP to RACI responsibilities09:11
- Assigning roles and finding gaps12:58
- Reviewing documents and agreeing requirements18:20
- One-Click Contracts and electronic signatures25:42
- Tracking commitments, delivery and dashboards31:35
- Project assistant preview37:27
- Recap and the RACI Survival Kit40:51
RACI Survival Kit: a starter project and the ISO 19650 responsibility matrix PDFs
Skip the blank RACI table. Start from the approach Episode 2 built, with two PDFs from our free ISO 19650 training on who is responsible for what.
- 1 starter project
- 2 PDFs
- Free
RACI starter project
Episode 2's approach as a project of your own: RACI roles on the Scope tasks, document sections ready to review and a contract per team, ready for your own task teams.
How to survive as a BIM Manager · Episode 1
Surviving the MIDP
Define. Agree. Relax. Your MIDP shouldn't live in a spreadsheet that dies in week three. We build one live in Plannerly, start to finish - defined, agreed, signed and tracked - with the first public look at CDE Connect.
Chapters
- Welcome - where is everyone joining from?00:00
- Sneak peek: CDE Connect and the new File Manager02:16
- The job nobody signed up for03:10
- What ISO 19650 actually asks for03:35
- Why the MIDP spreadsheet always dies04:44
- The four steps07:37
- Live build - starting from an empty project09:50
- Paste your list, get every file11:50
- Automatic file naming16:30
- SmartFolder sets18:33
- Build Scope - planning the deliveries21:15
- Teams, owners and assignment23:41
- Timeline, dependencies and critical path25:10
- RACI and multi-party assignment26:56
- Agreeing it on the record27:38
- The contract document28:20
- E-signatures30:14
- CDE Connect - why "common" data environments aren't32:23
- Connecting and syncing your CDEs33:32
- Mapping folders and keeping files in step38:30
- Dashboards that build themselves41:05
- Recap - stop chasing, start managing44:45
- Next time: Surviving the RACI45:36
- Thanks and close47:02
MIDP Survival Kit: a starter project and three ISO 19650 PDFs
Start your MIDP from the project Episode 1 built instead of a blank spreadsheet, with three PDFs from our free ISO 19650 training: the MIDP step, the detailed responsibility matrix and the whole process on one page.
- 1 starter project
- 3 PDFs
- Free
MIDP starter project
Episode 1's MIDP as a project of your own: task teams, milestones and deliverables in Scope, ready for you to paste in your own lists.
Go deeper
The job behind each episode, step by step, with templates
Run the MIDP
Episode 1's job: every deliverable named, agreed, signed for and tracked, without a spreadsheet to keep alive.
Episode 1Agree the RACI
Episode 2's job: one accountable team for every deliverable, agreed in a contract each team signs.
Episode 2Set the information requirements
Episode 3's job: requirements your supply chain can check its own work against.
Episode 3Connect your CDE
Episode 4's job: every CDE on the project kept in step with the plan, so delivered files check themselves off.
Episode 4MIDP template
Every task team's deliverables in one master information delivery plan: what, who, when and to what level, agreed and kept current.
TemplateFree PDFsEpisode 1Responsibility matrix (RACI) template
One accountable team for every deliverable, agreed and signed, for the high-level and the detailed responsibility matrix.
TemplateFree PDFsEpisode 2Questions
Questions about the webinars
Is the webinar free?
How long is each episode?
What time does it start?
I can't make it live. Can I still watch?
Do I need Plannerly to join?
Where can I get certified?
What's in the survival kits?
Do the job on your own project, not just watch it
Start free and follow along with any episode in your own project, with the lessons and setup guides for each step.
Start free and set up your requirements and delivery plans the way the episodes show.
Start free and run your next MIDP and RACI the way the episodes show.
Start free and agree the design team's deliverables the way the episodes show.
Start free and reuse the episodes' method on every client project.
Start free and use the episodes and replays as material for your class.
Free plan · No credit card · Replays and kits free