A new way to deliver
- Requirements structured digitally from day one
- Clear task ownership, linked to scopes of work
- Automatic model checks at every milestone
- One platform for updates, approvals and accountability
Digital construction case study
MTECH, Hong Kong specialists in BIM and digital twins, has used Plannerly on more than 16 projects at Hong Kong International Airport. Verifying BIM and ESG requirements now takes 80% less time, and quantity surveyors are involved earlier.
A Hong Kong-based leader in digital construction and asset lifecycle management, MTECH has been innovating since 1995. From early BIM work on the 2008 Beijing Olympics to its current focus on digital twins, AI and infrastructure megaprojects, MTECH keeps pushing the boundaries of what's possible with BIM.
As MTECH's projects grew in scope and complexity, disconnected workflows got in the way. Design updates, contract requirements and model data were often misaligned, managed through separate tools and endless spreadsheets. Checking whether models met the project specifications was slow, manual work across teams.
Green procurement and sustainability goals were often brought in too late. ESG thinking needed to be built in from day one, not retrofitted. Quantity surveyors in particular were brought in after major design decisions were made, which limited their say over the material choices that affect emissions, waste and long-term costs.
Plannerly lets us align quality, cost, and carbon goals - without adding more admin. We now open the door for Quantity Surveyors to participate in the project for Green Procurement across the full project life cycle.
Since 2019, MTECH has delivered more than 16 major projects at Hong Kong International Airport - the world's busiest cargo hub - with Plannerly as the foundation for its BIM and information management.
In their own words
With Plannerly, we don't just create a plan - we live it. It's how we put the BIM Execution Plan into daily practice.
Case studies
$4.5M / €4M
Saved · 310,000 sqm project
LIMSEN Consultants · BIM management
Coordinated 50 companies and 45 BIM models on one of Portugal's largest mixed-use developments. BEP planning time dropped from 100+ hours to under 30.
Using Plannerly was a cornerstone for us. There is no going back.
8x growth
6 → 50+ engineers · −10% costs
BuildEXT · General design firm
Grew from 6 employees to 50+ engineers across 4 departments. Now handles projects 30x larger with 10% lower construction and FM costs.
I cannot imagine using Excel or Word to start writing a BIM contract anymore.
95% faster
Model validation time
JTC Corporation · Government agency
Eliminated 11,000 Excel rows and automated compliance checks across 2,000+ object types and 27 model categories with Plannerly's Verify module.
Before Plannerly, it took weeks to do model checks. Now we do it in hours.
See all case studiesOwners, design teams, contractors, consultants and educators - filter them by your kind of organisation.
Book a live demo and see how scope, responsibilities and model checks come together in one place.