QA: model data checked against information requirements
- Owner information requirements: Defined
- Supply-chain model data: Checked
- Model deliverables: Traceable
Government case study
Queensland's Department of Transport and Main Roads uses Plannerly Verify to check supply-chain model data against clearly defined information requirements, giving the team more certainty that model deliverables contain the information they expect.
Brisbane, Queensland - Department of Transport and Main Roads - Model Checking + Information Requirements
It highlights the need for due diligence when pulling all of the pieces of the puzzle together to make sure there are no errors in the definition of our information requirements.
TMR
Information requirements
Model data
Exceptions
For a government transport team, model checking is not just about whether a model opens or whether geometry looks right. The model also needs the right information in the right places, connected to owner-defined requirements that can be checked consistently.
Plannerly gives TMR a workflow for turning information requirements into checks against the models produced by the supply chain. That creates a clearer path from requirement definition to verified deliverables, with exceptions that can be investigated before handover.
Manual review and assumptions
Defined, checked, traceable
Government infrastructure teams depend on model information that can be trusted beyond the design authoring environment. It is not enough for a model to contain objects; the right properties need to be present, named consistently, and aligned with the owner's information requirements.
Plannerly gives TMR a structured way to define those information requirements and then use Verify to check model data against them. That means model checking can move from manual inspection and scattered assumptions to a clearer process: define the requirement, run the check, investigate the result, and improve the model data.
This workflow gives the team more certainty about deliverables created by the supply chain. When something does not validate, the result gives reviewers a focused place to investigate instead of treating the whole model check as a vague pass-or-fail exercise.
One useful example came from a Noise Fence Design review. TMR used Plannerly Verify to check requirements including "Unique Object Code" and "Road Section ID." One requirement passed and one failed, giving the team a precise signal about where the model information needed closer investigation.
One pass, one fail.
Road Section ID
Road Section lD
During the support session, the team removed the "Road Section ID" requirement and Verify showed 100% compliance for the remaining requirement. Bryan McSweeney then recreated the requirement and simplified the verification rule to "any value (excluding empty)" to check whether the property existed with a value.
The result still came back at 50%. Plannerly's development team investigated the failed check and found the cause. It was not a bug. The model property contained a lowercase "l" where an "I" was expected in "ID." Visually, the two characters are almost identical in many interfaces, which made the issue extremely difficult to spot manually.
What an interesting issue and well spotted by the team.
That small mismatch mattered because model checking is exact by design. If the information requirement asks for Road Section ID but the model property is named Road Section lD, the value may exist somewhere in the model, but it is not attached to the requirement that has been defined.
Information requirements only create accountability when the naming, rule, object, responsibility, and evidence all line up. If a verification system silently accepts near-matches, teams can get a green result while their underlying data remains inconsistent. Plannerly made the mismatch visible so the team could fix the actual source of the failed check.
This detailed example shows the larger value of Plannerly for public owners. Government teams need a repeatable way to check whether delivered model information matches the requirements they have defined, especially when many people, systems, and organizations contribute to the same asset data.
For owners and public agencies, this is especially important. Information requirements often pass through many hands: client teams, designers, BIM managers, model authors, reviewers, and delivery partners. Plannerly helps make those requirements visible, testable, and traceable through model checking.
The outcome is a stronger model checking workflow: TMR can use Plannerly to connect owner-defined requirements to supply-chain model data, run checks consistently, and investigate exceptions with a clear trail back to the requirement.
That matters because model information is only useful when teams can trust it. Plannerly helps make information requirements more than static text. They become testable commitments that can be checked before small data issues become downstream handover problems.
Use Plannerly to define model information requirements clearly, then use Verify to test whether the delivered model data actually meets them. The more precise the requirement, the more useful the check.
The Queensland Department of Transport and Main Roads manages transport infrastructure and delivery across Queensland, Australia. In this case study, the team uses Plannerly Verify to check model information created by the supply chain against defined owner requirements.
This case was shared with permission from Bryan McSweeney, Manager - Special Projects, Digital Systems, Engineering & Technology, Infrastructure Management & Delivery.
Case studies
95% faster
Model validation time
JTC Corporation · Government agency
Eliminated 11,000 Excel rows and automated compliance checks across 2,000+ object types and 27 model categories with Plannerly's Verify module.
Before Plannerly, it took weeks to do model checks. Now we do it in hours.
53% fewer clashes
$130M residential project
Major Real Estate Developer · 800+ O&M team
A $130M apartment project achieved 16.5% time savings and 53% fewer clashes, with 98% of constructability issues solved vs 31% on the control project.
The Plannerly process prompted critical cross-company conversations months before they would have caused problems.
80% time saving
BIM & ESG verification
MTECH Engineering · Digital construction
Delivered 16+ major projects at Hong Kong International Airport. Setup time dropped from 90 days to 20 days, with ESG goals embedded from day one.
With Plannerly, we don't just create a plan, we live it. It's how we put the BIM Execution Plan into daily practice.
See all case studiesOwners, design teams, contractors, consultants and educators - filter them by your kind of organisation.
Plannerly helps government owners and project teams define, assign, and verify model information requirements before small data issues become big delivery problems.