Worked in smaller batches
BIM meets Lean: using a smaller batches approach, teams dialled in the element sequence, with mutually agreed system handoffs at the best time.
Owner case study
On a $130 million apartment project, the team ran a Lean BIM management approach with Plannerly, side by side with a similar project using traditional BIM processes. The result: a 16.5% time saving and 53% fewer clashes.
This case study features one of the world's largest real estate developers: a vertically integrated organisation that not only builds but also operates and maintains its own properties over the long term. With a portfolio of high-value residential developments and a dedicated in-house team of more than 800 operations and maintenance professionals, it puts a strong emphasis on long-term performance, resident experience and construction quality.
For this $130 million apartment project, the team adopted a Lean BIM management approach and tested it alongside a similar project using traditional BIM processes. The goal was clear:
BIM meets Lean: using a smaller batches approach, teams dialled in the element sequence, with mutually agreed system handoffs at the best time.
Compared to previous BIM projects, the team planned a clearer BIM scope for each stage. Every team member had detailed information on what they were responsible for, and when.
Every team member had secure access to the latest BIM Execution Plans, scopes and contracts, and could review 3D model progress.
The Plannerly process prompted critical cross-company conversations months before they would have caused problems, when the team would have been under extra pressure.
Case studies
95% faster
Model validation time
JTC Corporation · Government agency
Eliminated 11,000 Excel rows and automated compliance checks across 2,000+ object types and 27 model categories with Plannerly's Verify module.
Before Plannerly, it took weeks to do model checks. Now we do it in hours.
5x growth · 60% faster
VDC workflows streamlined
reiSource · VDC consultancy
Replaced 5 disconnected tools with one platform. Scope prep dropped from 8 hours to 2 and the team scaled from 3 to 15 without compromising quality.
What we used to do with five tools, we now do with one, and with more consistency.
$4.5M / €4M
Saved · 310,000 sqm project
LIMSEN Consultants · BIM management
Coordinated 50 companies and 45 BIM models on one of Portugal's largest mixed-use developments. BEP planning time dropped from 100+ hours to under 30.
Using Plannerly was a cornerstone for us. There is no going back.