Level of development

LOD 300: what it means and how to plan it

At LOD 300 a model element is the specific system, object or assembly that's been designed: its quantity, size, shape, location and orientation can be measured from the model. Teams usually ask for it at detailed design, element by element, never for the whole model at once.

Free plan, no card. Everyone you invite joins free.

app.plannerly.com
Plannerly Scope: a panel partition system at its milestone, with its level of detail, owning team and status and a tick for each required property, above the project's list of requirements

What LOD 300 means

LOD stands for level of development: how far an element's geometry and information have been thought through, and so how far the rest of the team can rely on it. The BIMForum LOD Specification describes each level, element by element. At LOD 300 three things are true:

It's the real thing

The element is the specific system, object or assembly that's been designed, not a generic placeholder.

You can measure it

Its quantity, size, shape, location and orientation can be measured from the model itself, without notes or dimension call-outs.

It's in the right place

It sits accurately relative to the project origin, so other teams can coordinate against it.

LOD 200, 300, 350 and 400, for one door

Here's how the same internal door develops:

Level The door in the model What you can use it for
LOD 200 A generic door, with approximate size and position Early layouts and options
LOD 300 The designed door: its actual width, height, frame and swing, where it will actually go Detailed design, coordination and quantities
LOD 350 As LOD 300, plus how it meets the things around it, such as the wall opening and the frame fixings Detailed coordination between trades
LOD 400 The door as it will be made and fitted, with fabrication and installation detail Fabrication and installation

Every level, with pictures, in levels of development, LOD 100 to 500.

When you need LOD 300

LOD 300 belongs to a milestone, not to the whole model. Ask for it element by element, when someone needs to rely on that element:

  • Detailed design: the design is fixed enough to coordinate, so the main elements reach LOD 300.
  • Coordination: other trades model against it, so its position and size must be dependable.
  • Quantities and cost: counts and measured quantities come straight from the model.
  • Not yet: furniture, finishes and anything still being decided can stay at LOD 200 until they matter.

Step by step

How to plan LOD 300 on your project

  1. Lay out the grid

    Elements down the side, broken down by a classification such as Uniclass, Uniformat or OmniClass, and the information exchange milestones across the top.

    Every element, every milestone
  2. Set the level per cell

    For each element and milestone, set the level it must reach. Not everything needs LOD 300 at the same time.

    LOD 300 only where it's needed
  3. Add the data and an owner

    Add the properties each element must carry at that milestone, and the team that models it, so every LOD 300 has a name next to it.

    Who models what, by when
  4. Check it

    Export the requirements as an IDS file for your authors, or check delivered models in Verify.

    The scope becomes the checks

In Plannerly Scope

Set LOD 300 where it's needed, and nowhere else

Scope

Every element, every milestone, one level

Plannerly Scope puts your elements down the side and the milestones across the top. In each cell you set the level the element must reach, the information it must carry and the team that owns it, using the BIMForum and AIA LOD frameworks, ISO 19650's level of information need or levels of your own.

  • LOD and level of information need in the same grid
  • Copy one cell's level and requirements to similar cells
  • Start from a template or a past project
Open the scoping guide
Plannerly Scope: elements by work package across preconstruction and operation, above the master information delivery plan

Verify

Check the information LOD 300 should bring

Geometry still needs a reviewer's eye. The information you ask for alongside it can be checked automatically: link the model's elements to their tasks, and Verify checks every property, value and unit, element by element.

See how Verify works
Plannerly Verify: a panel partition task checked against the architectural model at 99%, with its checklist and a pass count for each required property, beside the 3D model with passing walls in green and one flagged in amber

Look closer

See LOD requirements set on a real scope

Video

LOD numbers or plain language?

The LOD debate in a few minutes: fixed LOD scales or ISO 19650's plain-language level of information need, and how to set the level each element needs.

Free download

Plan your next scope from ours: a starter project and three free PDFs

Free download

Scope at Scale Survival Kit: a starter project and 3 PDFs

Everything to scope LOD and LOIN the way this page does: a starter scope with elements, milestones and requirements, and three free PDFs on combining LOD, LOIN and LOA, setting requirements and roles, and the detailed responsibility matrix.

  • 1 starter project
  • 3 PDFs
  • Free

Questions

LOD 300 questions, answered

What is LOD 300 in BIM?
A level of development where a model element is the specific system, object or assembly that's been designed, with its quantity, size, shape, location and orientation measurable from the model. It comes from the US AIA and BIMForum LOD frameworks, and it's usually asked for at detailed design. The BIMForum LOD Specification describes it element by element.
What's the difference between LOD 200 and LOD 300?
At LOD 200 an element is generic, with approximate size, shape and position: a door about here. At LOD 300 it's the door that's been designed, at its actual size and in its actual place, so other teams can coordinate against it and quantities can come from it.
What's the difference between LOD 300 and LOD 350?
LOD 350 adds the interfaces: how the element meets other systems, such as its supports, connections and openings. Teams usually ask for it where trades need to coordinate in detail, for example ceilings and building services.
Does the whole model need to be LOD 300?
No. A model is never one LOD: each element reaches its level at a milestone. Asking for LOD 300 throughout leads to over-modelling some things and arguments about others. Set the level per element and per milestone instead. How to build that matrix.
Is LOD 300 about geometry or information?
Mostly geometry, and how far it can be relied on. Recent BIMForum specifications describe geometry, with the information an element carries handled separately. Under ISO 19650 the level of information need covers geometry, information and documentation together. Plannerly lets you use either, or both.
How do I check that a model meets LOD 300?
The geometry still needs a person to review it, usually at the milestone's model review. The information you ask for alongside it can be checked automatically: in Plannerly, Verify checks every linked element's properties against your requirements, and you can export them as an IDS file for other checkers.

Plan LOD 300 element by element, not model by model

Start free, drag in a template and set the level, the information and an owner for every element at every milestone.

Free plan · No card · Everyone you invite joins free

Sign in to keep your progress

Use your Plannerly account - the same email and password as the app. Every lesson stays open either way.

Learned with a different email? Sign in to that account here and we'll bring its courses, progress and certificates into the one you're signed in with. Certificate links and QR codes keep working.

Forgot that password? Reset it first, then come back. Want to keep the other account instead? Sign out and sign in with that one.